Site Preparation: Concrete pad and proper drainage required.
-
Mounting: Secure the operator base to foundation; align with gate track.
-
Power & Wiring: Use the removable power box for low-voltage connections (120/240 VAC input).
-
Programming: Set open/close limits with digital display; SPS maintains position automatically.
-
Accessories: Integrate photocells, safety edges, loop detectors, and external receivers.
-
Battery Backup: Connect included batteries for up to 100 full cycles in power outage.
-
Final Testing: Confirm motor function, sensor logic, safety reversal, and error diagnostics via LCD display.